logo logo

Installing Patio Slabs

The highest point of a patio surface can be as much as an inch above gradeenough so that the lowest section is at gradeemove the sodhen remove 4 inches of soil plus the thickness of the pavers to make room for the 4inch gravel bed and a 1inch sand base, leaving the lowest surface of the pavers 1 inch above grade.