Concrete Silo Construction

At this point, the 4 fting is ready to be filled with concreteoncrete is hoisted by our own hoist and placed via the distributor carthen the pour is complete, the cycle is repeated until a maximum of 12 fter day is constructed andor the silo reaches its desired heightaterstop placed at each cold joint ensures a waterproof structure.